Key Takeaways

  • ALM ROI comes down to one formula: (gain from investment − cost of investment) ÷ cost of investment. The hard part is quantifying both sides honestly.
  • The highest costs of a fragmented toolchain are soft costs, like rework, manual traceability, reporting, and audit prep across requirements, test, and risk management.
  • In our example, a 50-person team sees a 148% three-year ROI and a payback period of under seven months.
  • SPK’s free ALM ROI Calculator lets you plug in your own numbers and build a defensible business case.

Many modern engineering teams still manage requirements in Word documents, test cases in spreadsheets, and risk analyses in separate files.  This data is transferred through email and shared folders, which works but is inefficient.  In regulated industries, tracking down each piece of information makes audit prepraation difficult.  This is why many engineering leaders see the value of an integrated ALM platform like PTC Codebeamer; they just may be worried about budgeting for it.  However, when you look at the numbers, the tool pays for itself by reducing the hidden cost of disconnected requirements, test, and risk management.  In this guide, we will cover the identification of hard and soft costs, realistic improvement benchmarks, and use cases for migrating to a new system.

How Do You Calculate The ROI Of An ALM Tool?

You can’t measure return without an honest picture of the cost of your current approach.  Our approach is as follows:

Divide the net gain (gain from investment minus cost of investment) by the cost of investment. In our example, a 50-person engineering team sees a 148% ROI over three years and pays back the investment in 6.7 months. This example assumes the full modeled benefit from the start and includes the estimated value of staff time recovered. 

In addition, you should consider how costs are calculated.  These costs can be classified into two categories:

  • Hard costs are the ones you see on an invoice: tool licenses, maintenance contracts, hosting, and consultants who maintain integrations.
  • Soft costs come in the form of lost time: engineers fixing avoidable defects, manually building reports, chasing traceability, and prepping for audits.

Soft costs are typically much larger, and they’re the ones most often left out of a business case. Both kinds show up in the three core ALM disciplines.

Requirements Management

Most rework begins with requirements. An ambiguous, incomplete, or untraceable requirement becomes a design question, a failed test, or a field issue later on. The later you catch it, the more expensive it is to fix.

  • Hard costs: standalone requirements tools, document management, and the custom scripts tying them to the development tools.
  • Soft costs: rework due to unclear requirements, manual change impact analysis, review cycles by email, and traceability matrices recreated in spreadsheets.

Test Management

If tests are separate from requirements, teams have trouble showing coverage and seeing what a change will break.

  • Hard costs: separate test management licenses and integrations to sync defects and test results with other tools.
  • Soft costs: retesting, defect fixing, manual test-to-requirement mapping, and weekly status reports generated by hand.

Risk Management

For regulated teams, risk analysis should tie hazards to requirements, risk controls, and verification. ISO 14971 for medical devices and ISO 26262 for automotive are examples of standards that make traceability mandatory.

  • Hard costs: risk spreadsheets or tools that require maintenance of their own, plus validation effort for each tool in the chain.
  • Soft costs: maintaining alignment of FMEAs and risk controls with evolving requirements, and collecting evidence in preparation for each audit.

Investment Costs of a New ALM Tool

The other side of the equation is the new platform cost:

  • License investment: User seats or subscriptions plus annual maintenance or support. For starters, have a look at Codebeamer licensing options.
  • Rollout investment: Deployment, configuration, data migration from legacy tools, and integration setup.
  • Training costs: If using Codebeamer, PTC can employ a train-the-trainer methodology, training core users during the rollout, who then train the rest of the team. SPK’s team can also provide training.
  • Ongoing operations: If an MSP handles administration and hosting, including that fee. Codebeamer cloud hosting or application management makes these costs predictable.

How to Calculate the ROI of Your ALM Tool

The formula is simple:

ROI = (Gain from investment − Cost of investment) ÷ Cost of investment.

The work is in filling in each side with credible numbers. The steps below follow the structure of SPK’s ALM ROI Calculator, using a 50-person engineering team as an example. Every figure is an illustrative default, so replace them with your own data.

Step 1: Define Your Scope and Baseline

Begin with the people affected and the value of their time. Include all individuals working in the ALM process: requirements, systems, software, test, and quality engineers. Then establish a fully burdened hourly rate and an analysis horizon. Our example uses 50 users, $95 per hour, 46 working weeks per year, and three years; however, you should use your own numbers to estimate the return for your team.

Step 2: Quantify Your Hard Costs

Next, list the tools and services the new platform could replace or minimize. This includes standalone requirements, test, and risk tools, their support contracts, and the annual cost of maintaining point-to-point integrations. In our example, legacy tools are $40,000/year, and integrations are $30,000/year.

Step 3: Quantify Your Soft Costs

Once you quantify hard costs, it’s time for soft costs. Estimate the hours your team spends on the activities ALM improves. Short time studies or team surveys work well here. Our example assumes:

  • 3 hours/engineer/week fixing errors and rework
  • 1 hour/engineer/week building status reports
  • 400 hours/year prepping for audits
  • 250 hours/year establishing and enforcing development processes

Multiply the hours by the hourly rate to get a dollar value. In this example, error correction alone costs $655,500 per year.

Step 4: Apply Realistic Improvement Benchmarks

Then, estimate the savings on each cost by implementing an integrated ALM platform. These are the average improvements reported by Codebeamer customers as reported by vendors. 

Area of benefit
Time spent fixing errors
Reporting time
Audit prep time
Process configuration time
Tool integration costs
Time to market
Improvement
25%
50%
40%
60%
80%
8%
Most affected ALM discipline
Requirements and test management
All three
Risk and requirements management
All three
Requirements and test management
All three

Step 5: Calculate Your Total ALM Investment

Now it’s time to sum up recurring and one-time costs over the analysis horizon. In our example, the recurring costs for licenses, hosting, and administration amount to $96,000 per year. One-time costs are $146,500 for rollout, data migration, integration setup, and training. Total investment is $434,500 over three years.

Step 6: Calculate ROI and Payback

With both sides quantified, the results for our example are:

Metric
Gross annual savings
Annual net savings after ALM recurring cost
Three-year gain
ALM cost for three years
Net benefit over three years
ROI in three years
Time to pay back
Engineering hours saved annually
Result
$359,325
$263,325
$1,077,975
$434,500
$643,475
148%
6.7 months
3,335 (approx. 1.8 FTEs)

About 76% of the savings are made up of two areas: less time fixing errors and less time building reports. That’s a clear sign that most of the value comes from requirements and test traceability. Don’t forget to look at what’s missing. In this example, faster time to market, based on $5 million in revenue and a 40% gross margin, would add about $160,000 per year. 

*The calculator excludes revenue acceleration from ROI by default and shows it as upside because it is harder to prove.

Step 7: Build the Business Case for Migration

Finally, convert your ROI into an approved project:

  • Start with the conservative argument. Apply a realization factor and omit time-to-market value. If the ROI holds, the upside just makes your case stronger.
  • Use your own data wherever possible. A small time study of rework and reporting hours is much more convincing than industry averages.
  • Include costs of switching. Ensure finance takes a holistic view that includes data migration, data validation, and short-term productivity impacts.
  • Add the benefits that don’t fit in a spreadsheet. They include audit readiness, better product quality, customer satisfaction, and less dependence on a few people who know where everything lives.
  • Migrate in stages. Start with one product line or discipline to reduce risk and achieve measurable results sooner.

Regulated teams should also plan for tool validation.

Turn Your ALM Investment Into a Business Case

Now that you know how to calculate the ROI of an ALM system, it’s time to put it into action. The trick is to make the case with your own numbers. Start conservatively, include the full switching costs, and use benchmarks to estimate, not to promise. SPK and Associates can help you along the way. Our team can assess your current requirements, testing, and risk processes, and help you build the business case. As a PTC partner, we can also handle Codebeamer implementation, migration, validated hosting, and ongoing management.

Want to see what an integrated ALM platform could do for your team? Download our ALM ROI Calculator and plug in your numbers, or contact SPK for an obligation-free assessment.

Latest White Papers

A Checklist for Reducing Time to Market in Engineering

A Checklist for Reducing Time to Market in Engineering

Product teams all have the same goal: produce high-quality products and reduce time to market. Achieving these goals simultaneously can be difficult, but your team doesn’t have to sacrifice one for the other. Learn how in this eBook.What You Will Learn In this eBook,...

Related Resources

Building Secure CI/CD Pipelines with GitLab in Air-Gapped Networks

Building Secure CI/CD Pipelines with GitLab in Air-Gapped Networks

Key Takeaways Air-gapped networks protect sensitive code and data, but they break the default assumptions of most CI/CD tools, which expect internet access for images, packages, and scanner updates. GitLab Self-Managed runs fully offline, keeping source control,...

Successfully Migrate Your Requirements from IBM DOORS to Codebeamer

Successfully Migrate Your Requirements from IBM DOORS to Codebeamer

Key Takeaways Codebeamer manages the whole lifecycle. Requirements, risk, testing, and change management live in one platform instead of separate tools. Traceability and compliance are built in. End-to-end links and regulatory templates support standards such as ISO...