fbpx
spk-logo-tm-2023
0%
1-888-310-4540 (main) / 1-888-707-6150 (support) info@spkaa.com
Select Page

Streamlining Project Management by Linking to Existing Codebeamer Requirements

windchill features best plm software
Written by Carlos Almeida
Published on August 10, 2024
Categories: Codebeamer | PTC | Video

Introduction

Hello, this is Carlos Almeida with SPK and Associates. I was asked regarding CodeBeamer how to trace existing requirements together when we use what you’ve already made. So let’s look at a couple of trackers here.

Requirement Trackers

I have a Customer Requirement Specifications tracker, and it has a System Requirement Specifications tracker. I want to trace a System Requirement Specification to a Customer Requirement Specification. I’ll open that up. I’ll select one of my Customer Requirements, and if I were to click here, you’d see that it would create a brand new one, which is not what I want. If I look at a specific tracker in the Properties tab here, you’ll see there’s no references yet. So let’s create one.

Creating a Tracker

The way you do that is you take advantage of a library. This is this little box with a check inside. When you initially click on that, this will be empty, and so what you want to do is click on the gear and then select which projects you want to have inside. You can add at the project level, like I did here for Basic Training, or you can go in and have it at the tracker level.

So let me bring back my Properties tab again. There’s no reference here. Go in and open this up. So I’d like to trace this existing specification over to this Customer Requirement. So I’m going to grab it, and you’ll see how this hovering it over allows me to create an association or reference. So I’m going to make this a reference.

So you’ll see that the reference was created. Let’s double-check that by going back to the Properties. There it is. Now, if I want to remove it, you have to remove going upstream. So you click on the thing you just created, and you’ll see Customer Requirement is the thing that you were traced to. You can select into this box and then remove it. There you go. Thank you very much.

Latest White Papers

Open Source Due Diligence Checklist

Open Source Due Diligence Checklist

Proper open-source software management is vital to ensuring issue-free code. This checklist will explore the practices your team must take to prevent coding issues. What You Will Learn In this eBook, you will discover the best questions to ask and warning signs to...

Related Resources

Decoding the Pros and Cons of SolidWorks and PTC Creo

Decoding the Pros and Cons of SolidWorks and PTC Creo

CAD engineers and product designers rely on powerful tools to turn innovative ideas into a manufacturable reality. Two CAD systems, PTC Creo and Dassault Systèmes SolidWorks, stand at the forefront of this landscape. Each tool offers a suite of features tailored for...

Ten Windchill PLM Strategies to Maximize Productivity and Reduce Costs

Ten Windchill PLM Strategies to Maximize Productivity and Reduce Costs

You will be taken to another page to registerBy submitting this form, I acknowledge receipt of SPK and Associates' Privacy Policy.Is your product lifecycle management system driving real business value—or just managing data?  In this practical and engaging webinar,...