spk-logo-tm-2023
0%
1-888-310-4540 (main) / 1-888-707-6150 (support) info@spkaa.com
Select Page

PDM SolidWorks Tutorial: Installation Manager

windchill features best plm software
Written by Daniela Alcantar
Published on April 18, 2022

Introduction to the SolidWorks tutorial

Hi, I’m Daniella. I am the SolidWorks PDM SME for SPK and Associates. Today I’ll be going through a quick PDM SolidWorks tutorial on blank installation managers.

How to resolve blank installation managers in PDM SolidWorks

As you can see here I’m working on an  installation for SolidWorks 2021, but the installation manager is blank – there’s nothing I can click on. This is actually caused by a couple of HTML files being blocked. So, when you download the zip file either from SolidWorks or your value-added reseller, you may unzip the files using the default windows utility. This often blocks some of those HTML files. A great work around is to install 7zip and unzip using seven zip. However, if that’s not possible you can go ahead and unblock those HTML files.

So, here I’m in installation and media. I’m going to navigate to SLDIM, Lang, English, HTML. All these HTML files you will want to  right-click. Go to properties and then go to unblock and apply the same thing for this one. We are going to unblock, right click properties, unblock, apply.

Okay, now let’s go back to our installation manager. And here we go – we are back in business.

We hope you found this PDM Solidworks tutorial helpful.

Subscribe to our YouTube channel for even more Solidworks PDM tricks and tips!

Latest White Papers

Introducing Atlassian’s Service Collection

Introducing Atlassian’s Service Collection

Are you looking for new tools that empower your teams to deliver exceptional service experiences? Atlassian’s Service Collection ensures great service for both employees and customers. What You Will Learn In the following eBook, you will discover: The tools and...

Related Resources

5 Ways to Reduce Engineering Cycle Time Without Adding Headcount

5 Ways to Reduce Engineering Cycle Time Without Adding Headcount

Key takeaways Faster engineering does not always require more headcount: Disconnected systems, manual handoffs, rework, and poor visibility often create more delays than a lack of engineering capacity. A digital thread can eliminate major sources of wasted time:...

Why Late-Stage Changes Are Killing Your Time to Market

Why Late-Stage Changes Are Killing Your Time to Market

Key Takeaways Late-stage changes get expensive fast: The farther a problem travels through design, testing, and manufacturing, the more time, cost, and rework it creates. Disconnected systems and weak traceability are major causes: When requirements, design, software,...

What CIOs Get Wrong About PLM and Digital Thread Strategy

What CIOs Get Wrong About PLM and Digital Thread Strategy

PLM and Digital Strategy for CIOs Hello, everyone, and welcome back to another SPK and Associates vlog. My name is Michael Roberts. I'm the Vice President of Sales and Marketing here at SPK and Associates. Today, we're tackling a topic that comes up consistently in...